| TARGET BEP 6 BULAN |
| 1. |
Manajemen fee, training, supervise awal, grand opening |
Rp 10.000.000 |
| 2. |
Mesin Operasional |
Rp 28.000.000 |
|
-mesin cuci electrolux kapasitas 7 kg
-meja vacuum + boiler 5 liter
-mesin pengering listrik electrolux 5kg
-standing iron steam
-timbangan digital
-vacuum cleaner |
2 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit |
|
|
| 3. |
Bahan baku awal dan penunjang lainnya |
Rp 4.000.000 |
|
T O T A L |
Rp 42.000.000 |
Catatan : belum termasuk sewa tempat, biaya survey, transpotasi team supervisi, furniture, neon box dan kemasan lainnya, ongkos kirim peralatan, instalasi air dan listrik.